Egyptian GroupEgyptian GroupHARD STEEL
All products
Industrial — made to order

Boiler Connections

Steam piped right, from day one.

Boiler hook-ups, steam mains and condensate return — from boiler to line to machine. There is no margin here: high pressure, high temperature, and a weak joint is a danger to whoever stands next to it. We build with pipe, flanges, traps and valves rated for the pressure, calculate thermal expansion, place the supports properly, and lag the line. Welds are inspected and documented before it runs.

Specifications

Steam mains · condensate · steam traps
Carbon steel Sch 40 · stainless
Thermal expansion and supports calculated
Documented weld inspection before start-up

Specify what you need

Specify what you know — the engineer sees the rest on site.

Request a site visit

This is made to measure — an engineer comes out, takes the measurements and sees the site, then we price it.